摘要
对沉管灌注桩的沉桩工艺进行了简单介绍,结合监理工作的实践,分别从"事前、事中、事后"三个方面阐述了沉管灌注桩施工质量监理控制要点,以达到预期的质量控制目标,从而为上部结构的施工提供良好的基础。
It simply introduces the pile-sinking technology of sink tube cast in place pile. Combined with the practice of supervision, it represents the construction quality supervise control points of sink tube cast in place pile from the before, in and after the work, to gets the prospective quality control target, and gives a good basis to the construction of upper structure.
出处
《山西建筑》
2008年第1期235-236,共2页
Shanxi Architecture
关键词
沉管灌注桩
施工监理
质量控制
sink tube cast in place pile, construction supervise, quality control