摘要
通过分析原260 M3高炉主卷扬的设计,对原设计的电机,制动器,检测器等进行了改进,新的设计方案更加科学、经济。
The original design of the 260M^3 blast furnace master hoists was analyzed, the original design of the motor, brakes, and detector were improved. Practice show that the new design is more scientific, and economic.
出处
《装备制造技术》
2008年第4期147-147,153,共2页
Equipment Manufacturing Technology