摘要
从设计与施工方面分析了造成坍塌原因,根据软基开挖特点采取了分段开挖与支护等措施,取得了较好的效果,保证基坑的安全施工,提前完成了基坑的施工任务。
In this paper,causes of failure of a foundation pit are analyzed by design and construction . According to the characteristics of digging,a remdial mesure that dig apart and suport apart has been proposed. It is verified that the control mesure is effective and the foundation pit is safty in the process of construction. It brings the time limit for engineering to an earlier conclusion.
出处
《福建建筑》
2008年第5期47-50,共4页
Fujian Architecture & Construction
关键词
软土基坑
坍塌
支护
补救
soft clay
failure of pit
foundation pit
control method