摘要
本文结合工程实例,介绍了土钉-水泥土墙组合支护技术,即在土钉墙背设置水泥土桩,与土钉墙共同形成坑壁垂直的联合支护,并在关键部位的搅拌桩内打设钢管。经实践证明,该方法安全、经济,且可靠性高。
This paper introduced the technology of soil-nails and cement-soil mixed pile to bracing structure. The vertical united support is combined with cement-soil mixed piles and soil- nails wall, some steel tubes are drive into pivotal cement-soil mixed pile. Practice has shown that the method is safe, economical and reliable.
出处
《福建建筑》
2008年第5期58-59,共2页
Fujian Architecture & Construction
关键词
深基坑
土钉墙
水泥搅拌桩
增强钢管
deep foundation pit soil-nails wall
cement-soil mixed pile
reinforcing steel tube