摘要
详细阐述了在钢结构安装中针对高精度要求采取的精密工程测控方法,通过阶段性测量控制辅助安装,保证了最终安装质量的要求。
It is expounded in detail that the precision measuring and controlling methods for erecting steel structures with high precision requirements. The final erection quality can he ensured by stage measuring & controlling as well as auxilliary erections.
出处
《钢结构》
2008年第4期68-71,23,共5页
Steel Construction
关键词
精密
工程测量
钢结构工程
precision project measurement steelwork project