期刊文献+

网络控制系统中网络调度算法的研究现状与展望 被引量:5

Status and Prospect of Network Scheduling Algorithm in Networked Control Systems
下载PDF
导出
摘要 根据不同现场总线网络协议的特点,主要从基于优先级调度和基于表的调度两大方面对网络调度算法的研究进行分类,从优先级选取依据、调度优化以及基于表的动静态调度等方面总结了现有的网络调度算法,最后指出了还有待解决的问题。 Based on the characteristic of field bus network protocol, the network scheduling was divided into prioritydriven scheduling and table-driven scheduling. Summarized the existing network scheduling from some aspects, the criterion of priority selection, scheduling optimization, table-driven static and dynamic scheduling. At last, the problems need to be resolved are pointed out.
出处 《化工自动化及仪表》 CAS 2008年第2期1-6,9,共7页 Control and Instruments in Chemical Industry
关键词 网络调度 网络控制系统 调度优化 network scheduling networked control systems scheduling optimization
  • 相关文献

参考文献51

  • 1BELDIMAN O V.Networked Control Systems[D].Durham,USA:Duke University,2001.
  • 2ZHANG Wei.Stability Analysis of Networked Control Systems[D].Cleveland,USA:Case Western Reserve University,2001.
  • 3LIU C L,LAYLAND J W.Scheduling Algorithms for Multipro gramming in a Hard Real-time Environment[J].Journal of the ACM,1973,20(1):46-61.
  • 4ALBERTOS P,CRESPO A,RIPOLL I,et al.RT Control Scheduling to Reduce Control Performance Degrading[C]//Proc of the 39th IEEE CDC.Sydney,Australia,2000:4889-4894.
  • 5SAHOO D R,SWAMINATHAN s,AL-OMARI R,et al.Feedback Control for Real-time Scheduling[C]//Proceedings of the 2002 American Control Conference.Alaska,USA,2002:1254-1259.
  • 6CERVIN A,ALRIKSSON P.Optiltlal On-line Scheduling of Multiple Control Tasks:A Case study[c]//Proceedings of the 18th Euronmicro Conference on Real-time Systems(ECRTS'06).Dresden,Germany,2006.
  • 7CARDEIRA C,MAMMERRI Z.A Schedulability Analysis of Tasks and Network Traffic in a Distributed Real-time Systems[J].Measurement,1995,15(1):71-83.
  • 8TINDELL K W,BURNS A.Guaranteed Message Latencies for Distributed Safety-critical Hard Real-time Control Networks[R]//Technical Report YCS 229.York,UK:University of York,1994.
  • 9TINDELL K W,BURNS A,WELLINGS A J.Calculating Controller Area Network(CAN)Message Response Times[J].Control Eng Pratt,1995,3(8):1163-1169.
  • 10TINDELL K W,HANSSON H,WELLINGS A J.Analysing Real-time Communications:Controller Area Network(CAN)[C]//Prec 15th IEEE Real-time Systems Symp.San Juan,Puerto Rico,1994:259-263.

二级参考文献14

  • 1[1]Radu Dobrin,Gerhard Fohler. Implementing off-line message scheduling on controller area network (CAN)[A]. Proc of Emerging Technologies and Factory Automation[C]. Antibes-Juan Les Pins, 2001. 241-245.
  • 2[2]Marco Di Natale. Scheduling the CAN bus with earliest deadline techniques[J]. Proc of Real-Time Systems Symposium[C]. Italy: M Pisa University, 2000. 259 -268.
  • 3[3]Khawar M Zuberi,Kang G Shin. Design and implementation of efficient message scheduling for controller area network[J]. Computers IEEE Trans, 2000,49(2): 182-188.
  • 4[4]G Leen, D Heffernan. TTCAN: A new time-triggered controller area network[J]. Microprocessors and Microsystems, 2002,26(2): 77-94.
  • 5[5]Seung Ho Hong. Scheduling algorithm of data sampling times in the integrated communication and control systems[J]. Control Systems Technology, 1995,3(2): 225-230.
  • 6[6]Yong Ho Kim,Wook Hyun Kwon,Hong Seong Park. Stability and a scheduling method for network-based control systems[A]. Proc of Industrial Electronics, Control, and Instrumentation[C].Taipei,1996.934-939.
  • 7[7]Seung Ho Hong,Yu Chul Kim. Implementation of a bandwidth allocation scheme in a token-passing fieldbus network[J]. Instrumentation and Measurement,2002,51(2):246-251.
  • 8SEUNG H H. Scheduling algorithm of data sampling times in the integrated communication and control systems[J].Control Systems Technology, 1995,3(2): 225 -230.
  • 9SEUNG H H,YU C K. Implementation of a bandwidth allocation scheme in a token-passing fieldbus network[J].Instrumentation and Measurement, 2002, 51 (2):246-251.
  • 10Tindell K.Calculating Controller Area Network Message Response Time[J].Control Engineering Practice,1995,3(8):1163-1169.

共引文献29

同被引文献20

  • 1田静,黄亚楼,王立文,李国洪.CAN总线固定优先级调度算法的应用[J].计算机工程,2006,32(23):94-96. 被引量:15
  • 2王艳,陈庆伟,樊卫华,胡维礼.网络控制系统控制与调度协同设计的研究进展[J].兵工学报,2007,28(1):101-106. 被引量:12
  • 3Eker J , Hngander P, Arzon K E. A feedback scheduler for real time control tasks [ J ]. Control Engineering Practice,2000,8 ( 12 ) : 1369-1378.
  • 4Chen Jiming,Wang 22ai,Stm You:dan. A basic study on algorithm of real- time schedule table for fieldbus[ C ]//Intelligent Control and Automation, Proceedings of the 4th World Congress on,21302:1760-1763.
  • 5Yin Jinyong, Guo Guochang. An algorithm for scheduling aperiodic real-time tasks on a static schedule [ C ]//ICIC ' 09, Second International Conference on ,2009:70-74.
  • 6Fang Xia. Integrated feedback scheduling of networked control systems [ J ]. Journal of Dynamics of Continuous Discrete and Impulsive,System Series B,2006.
  • 7Marti P, Fohler G, Ramamritham K, et al. Improving quality-of- control using flexible timing constraints: metric and scheduling issues [ J ]. Real-Time Systems Symposium ,2002.
  • 8Gerard L,Nicolas R. Real-time communications over broadcast networks: the CSMA-DCR and the DODCSMA-CD protccols[ J ]. INRIA Report RR-1863.
  • 9Zeltwanger H.Gateway Between CAN Open and ISO 11992 or SAE J1939[A].Proc.of Society of Automotive Engineerings[C].2000.
  • 10Walsh G C,Hong Ye.Scheduling of Networked Control Systems[J].IEEE Transactions on Control Systems Technology,2001,21 (1)..57-65.

引证文献5

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部