工作流的不确定时间建模与分析新方法 被引量:2

A novel approach to modeling and analyzing uncertain time of workflows
下载PDF
导出
摘要 针对现实企业中工作流时间管理的实际需求,提出了一种多过程不确定时间的建模与分析方法:首先基于扩展模糊时间工作流网(EFIWFN)对不确定性时间信息进行全面描述,然后构建生成图(sprouting graph)来表达 EFTWFN 中实例所经过的路径和时间信息,再依据生成图进行相关问题的分析计算。该方法实用性较强,能够有效推理分析资源约束情况下多过程的不确定时间问题,而且还可通过模糊时间运算,提供活动执行情况的可能性值,作为重要的参数指导用户决策或优化工作流模型。另外,生成图建立后,可针对不同问题进行多次使用,可重用性较好。该方法应用于某一制造企业并采用工具CPN Tools 进行仿真的结果验证了其有效性。 According to the practical need of workflow time management in the enterprises, the paper presents a new approach to modeling and analyzing uncertain time of workflows. The method firstly models the uncertain temporal information in workflows based on the extended fuzzy timing workflow nets (EFTWFN), then constructs the sprouting graph from the EFTWFN models of multi-process, and finally, selves the problems of uncertain time according to the sprouting graph. The approach can not only solve the uncertain time problems for multi-process of workflows under resource constraints, but also return the possibility of executing information of activities to support decisions of users or optimize the workflow models. Furthermore, it is easy to be reused, namely the sprouting graph can be used for more than one problem. In the end of the study, an application of the approach was illustrated through an example in manufacturing enterprise and its validity was explained by simulation of CPN tools.
出处 《高技术通讯》 CAS CSCD 北大核心 2008年第5期505-510,共6页 Chinese High Technology Letters
基金 863计划(2006AA04Z151 2006AA04Z166) 国家自然科学基金(60674080)资助项目
关键词 多过程 资源约束 可能性理论 扩展模糊时间工作流网 生成图 multi-process, resource constraint, possibility theory, extended fuzzy timing workflow nets (EFTWFN), sprouting graph
  • 相关文献

参考文献13

二级参考文献49

  • 1田立勤,林闯.一类可由基本模型嵌套组成的工作流系统的性能分析方法[J].电子学报,2003,31(z1):2167-2170. 被引量:6
  • 2范玉顺.工作流管理技术基础--实现企业业务过程重组.过程管理与业务过程自动化的核心技术[M].北京:清华大学出版社/施普林格出版社,2001.110-169.
  • 3李人厚.智能控制理论与方法[M].西安:西安电子科技大学出版社,1999..
  • 4Eder Johann, Euthimios Panagos. Managing time in workflow systems [OL]. http://citeseer. nj. nec. com/eder00managing.html, 2002.
  • 5Zhuge Hai, Cheung To-yat, Pung Huang-keng. A timed workflow process model [J]. The Journal of Systems and Software, 2001, 55(3): 231-243.
  • 6Ling Sea, Sehmidt H . Time Petri nets for workflow modeling and analysis [C]. In: Proceedings of IEEE International Conference on System, Man and Cyberneties, Nashville,Tennessee, 2000. 3039-3034.
  • 7Zhou Yi, Tadao Murata. Petri net model with fuzzy-timing and fuzzy-metric [J]. International Journal of Intelligent Systems,1999, 14(8): 719-746.
  • 8Tadao Murata. Temporal Uncertainty and Fuzzy-Timing High-Level Petri Nets [M]. In: Billington J, Reisig W, eds.Application and Theory of Petri Nets, Lecture Notes in Computer Science. New York: Springer-Verlag, 1995, 1091:11 -28.
  • 9Zhou Yi, Tadao Murata, deFanti TA. Modeling and pedormance analysis using extended fuzzy-timing Petri nets for networked virtual environments [J]. IEEE Transactions on System, Man and Cybernetics, 2000, 30(5): 737-756.
  • 10Dubois D, Prade H. Processing fuzzy temporal knowledge [J].IEEE Transactions on System, Man and Cybernetics, 1989, 19(4) : 729-744.

共引文献110

同被引文献8

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部