摘要 针对项目经济评价中存在的不确定性,提出了基于区间分析的项目经济评价方法。区间分析是以"区间数"为处理对象的一种不确定性数学分析方法。当各要素(如现金流、贴现率等)为区间数时,研究了求解区间净现值和区间内部收益率的方法,给出了通过区间净现值和区间内部收益率进行项目经济评价的规则,并研究了这2种方法。结果表明,在进行项目经济评价时,2种方法本质是一致的。 This paper presents a method of evaluation of project economy based on interval analysis to improve the certainty of the evaluation. Interval analysis is an uncertainty mathematical method dealing with interval numbers. When uncertain elements, such as cash flow and discount rate, can be expressed with interval numbers, another method is proposed for finding interval net present value (NPV) and interval internal rate-of-return (IRR). The paper gives rules of evaluation of project economy via interval NPV and interval IRR. The relation between the two methods is studied, and it is concluded that the two methods are essentially accordant.
出处 《工业工程》 2008年第3期16-19,共4页 Industrial Engineering Journal
基金 国家自然科学基金资助项目(70701026)
关键词 区间分析 净现值 内部收益率 interval analysis net present value (NPV) internal rate-of-return (IRR)
  • 相关文献

参考文献9

  • 1Sherif M, Alison K. Modelling project investment decisions under uncertainty using possibility theory [J]. International Journal of Project Management, 2001,19(4) : 231-241.
  • 2黄生权.基于不确定性的投资评价指标——净现值的研究[J].技术经济与管理研究,2002(2):63-63. 被引量:5
  • 3Eyler R C, Michael E K. Using simulation software to solve engineering economy problems [J]. Computers & Industrial Engineering, 2003,45 : 285-294.
  • 4Chang I S, Yasuhiro T, Gen M, et al. An efficient approach for large scale project planning based on fuzzy Delphi method [J]. Fuzzy Sets and Systems, 1995, 76:277-288.
  • 5Aleksandar D. Fuzzy engineering economy analysis [ J ].IEEE transaction on power systems, 2000,15 (1) :283-289.
  • 6Goyal A K, Tien J M, Voss P A. Integrating uncertainty considerations in learning engineering economy[ J]. The Engineering Economist, 1997,42 (3) :249-257.
  • 7扶缚龙,黄健柏.不确知有理数在投资项目决策中的应用[J].统计与信息论坛,2002,17(1):10-14. 被引量:6
  • 8Atanu S, Tapan K P, Debjani C. Interpretation of inequality constraints involving interval coefficients and a solution to interval linear programming [ J ]. Fuzzy Sets and Systems, 2001, 119:129-138.
  • 9李汶华,郭均鹏.基于决策者满意度的区间DEA的求解[J].管理工程学报,2005,19(1):87-89. 被引量:7

二级参考文献9

  • 1郭均鹏,吴育华.区间数据包络分析的决策单元评价[J].系统工程理论方法应用,2004,13(4):339-342. 被引量:23
  • 2Cooper W W,Park K S,Yu G.IDEA and AR1DEA:Models for dealing with imprecise data in DE A [ J ]. Management Science, 1999,45 ( 4 ) : 597- 607.
  • 3lshibuchi H, Tanaka H. Multiobjective programming in optimization ofthe interval objective function[ J ]. European Journal of Operational research, 1990,48 : 219 - 225.
  • 4Chanas S, Kuchta D. Multiobjective programming in optimization of the interval objective function-A generalized approach[ J]. European Journal of Operational Research, 1996,94 : 594 - 598.
  • 5Atanu S, Tapan K P, Debjani C. Interpretation of inequality constraints involving interval coefficients and a solution to interval linear programming[ J ]. Fuzzy Sets and Systems, 2001,119 : 129 - 138.
  • 6荆新等.财务管理学.中国人民大学出版社,1998.12.第2版.
  • 7刘新旺,达庆利.一种区间数线性规划的满意解[J].系统工程学报,1999,14(2):123-128. 被引量:46
  • 8周黔,王应明.区间DEA模型研究[J].预测,2001,20(1):78-80. 被引量:20
  • 9韦钢,贺静.电网规划中不确定性信息处理的现状及存在问题[J].上海电力学院学报,2003,19(4):33-37. 被引量:11

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部