杭甬线输气管道工程防腐专业的设计与施工 被引量:6

Summarization on Design and Construction of Corrosion Control System in Hang-Yong Gas Pipeline
下载PDF
导出
摘要 根据工程的需要,深阳极地床位置的选择应更加灵活,在满足功能需求的同时,降低征地需求,节省工程成本。热煨弯管和站内埋地管道防腐层的选择除考虑技术性能外,还应考虑在施工中各种外界因素的影响,提出相关应对措施。 According to the need of the present project,deep well anode ground bed position selection shall be more flexible.While functions are met,land occupation shall be reduced to save cost of the project.The technical performance shall be considered in coating selection for hot bends and buried pipelines within stations and various outside factors during construction shall be considered also and correspondent measures shall be put forward.
作者 李浩
出处 《天然气与石油》 2008年第2期1-3,共3页 Natural Gas and Oil
关键词 深阳极地床 热煨弯管外防腐层 定向钻穿越 Deep well anode ground bed Hot bend coating Directional drilling crossing
  • 相关文献

参考文献4

  • 1NACERP0572-2001,外加电流深地床的设计、安装、操作与维护[S].
  • 2张平,龚树鸣,李浩.深阳极地床技术在工程上的应用[J].天然气与石油,2005,23(4):24-26. 被引量:5
  • 3SY0007-1999.钢质管道及储罐腐蚀控制工程设计规范[S].[S].,..
  • 4SY/T4079-95.石油天然气管道穿越工程施工及验收规范[S].[S].,..

二级参考文献1

  • 1皮博迪AW 吴建华 许立坤 王廷勇 译.管线腐蚀控制[C].北京:化学工业出版社,2004,4..

共引文献21

同被引文献44

引证文献6

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部