摘要
根据工程的需要,深阳极地床位置的选择应更加灵活,在满足功能需求的同时,降低征地需求,节省工程成本。热煨弯管和站内埋地管道防腐层的选择除考虑技术性能外,还应考虑在施工中各种外界因素的影响,提出相关应对措施。
According to the need of the present project,deep well anode ground bed position selection shall be more flexible.While functions are met,land occupation shall be reduced to save cost of the project.The technical performance shall be considered in coating selection for hot bends and buried pipelines within stations and various outside factors during construction shall be considered also and correspondent measures shall be put forward.
出处
《天然气与石油》
2008年第2期1-3,共3页
Natural Gas and Oil
关键词
深阳极地床
热煨弯管外防腐层
定向钻穿越
Deep well anode ground bed
Hot bend coating
Directional drilling crossing