首都机场A380机库屋盖整体提升施工技术 被引量:18

Integral Lifting Technology for A380 Hangar Roof of Capital Airport
下载PDF
导出
摘要 首都机场A380大型机库屋盖采用了整体提升的施工技术。该工程整体提升关键技术创新点主要包括采用逐点失效准则进行支撑系统和提升设备荷载工况计算;采用钢屋盖结构、提升设备和提升支撑系统一体化建模进行提升工况分析;采用位置同步和载荷分配相结合的控制方案进行多组、多点同步控制提升;采用实时监测技术进行屋盖钢结构提升施工应力监控。 Integral lifting technology was used in A380 hangar roof of Capital Airport. Supporting system and lifting equipment load cases were calculated with gradual failure criterion. Lifting cases were analyzed with steel roof, lifting equipment and system integrative modeling method. Roof structure was synchronous control lifted by multi-group and multi-point method with combination scheme of position synchronization and load distribution. Stress of steel roof structure was monitored with real-time monitoring technology during lifting. All the technologies mentioned are key innovative points of integral lifting technology.
出处 《施工技术》 CAS 北大核心 2008年第5期73-74,85,共3页 Construction Technology
关键词 A380机库 整体提升 同步控制 实时监测 A380 hangar integral lifting synchronous control real-time monitoring
  • 相关文献

同被引文献85

引证文献18

二级引证文献84

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部