摘要 针对转炉特钢流程轧钢工序、连铸工序的生产特点,对轧制计划规则生成进行了描述,提出了基于规则的轧钢生产计划排产启发式算法,给出了详细求解步骤.在分析实际生产状况的基础上,对连铸浇次计划生成规则进行了描述,建立了连铸浇次最优化模型,同时对生产排产系统进行了总体设计和技术架构.运用Delphi7.0和SQL Server2000开发了生产排产系统,并应用于中型转炉特钢厂,实践证明模型实用可靠,系统通用性强. According to the characteristics of the rolling and casting process in BOF special steel plants, the rolling plan compiling rules were described. The heuristic algorithm based on the rules for rolling production planning optimization was put forward, and some procedures to make the plan were given out in detail. On the basis of the analysis of real production state, cast plan compiling rules were described, and the model of cast plan optimization was established. Moreover, the overall design and technology realization of a production planning system were processed. By using Delphi 7.0 and SQL Server2000, the production planning system was developed and applied to one medium-sized converter special steel plant, and its practicality, reliability and versatility were proved in practice.
出处 《北京科技大学学报》 EI CAS CSCD 北大核心 2008年第5期566-570,共5页 Journal of University of Science and Technology Beijing
基金 教育部新世纪优秀人才支持计划资助项目(No.NCET-07-0067)
关键词 转炉 生产排产 轧钢 浇次 启发式算法 BOF production plan scheduling rolling cast heuristic algorithm
  • 相关文献

参考文献3

二级参考文献21

  • 1唐立新.CIMS下生产批量计划理论及其应用[M].北京:科学出版社,1998..
  • 2NJ尼尔逊 石纯一译.人工智能原理[M].北京:科学出版社,1983..
  • 3Tamaru R, Nagai M.Synchronized Scheduling Method in Manufacturing Steel Sheets.IFORS, 1998, 5 (3): 189-199.
  • 4Lee H S, Murthy S S, Haider S W, et al..Primary Production Scheduling at Steelmaking Industries.IBM J.Res.Develop., 1996, 40 (2): 231 -252.
  • 5Balas E, Martin C.Combinatorial Optimization in Steel Rolling.In: DIMACS/RUTCOR Workshop on Combinatorial Optimization in Science and Technology.New Brunswick, NJ: Rutgers University, April 1991.
  • 6Jacob L T, Wright J R, Cobb A E.Optimal Inter Process Steel Production Scheduling. Computers and Operations Research, 1988, 15: 497-507.
  • 7Dorn J, Kerr R M.Co-operating Scheduling Systems Communicating through Fuzzy Sets.In: Preprints of the 2nd IFAC/IFIP/IFORS-Workshop on Intelligent Manufacturing Systems (IMS'94) Vienna, June 1994: 367-373.
  • 8Tang L X, Liu J Y, Rong A Y, et al..A Multiple Traveling Salesman Problem Model for Hot Rolling Scheduling in Shanghai Baoshan Iron and Steel Complex.European Journal of Operation Research, 2000, 124: 267-282.
  • 9TANG Lixin,ZHANG Guofan,YANG Zihou,et al..Research on Hot-rolling Scheduling for Tube Production.IRON AND STEEL,1999,(4):73-76.(唐立新, 张国范, 杨自厚, 等.热轧钢管轧批排序模型及算法.钢铁, 1999, 34 (4): 73-76.)
  • 10Siddique M.A Knowledge-based System for Process Planning in a Seamless Steel Tube Plant.Ph.D.thesis, Aston University, United Kingdom, 1990.

共引文献11

同被引文献85

引证文献8

二级引证文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部