摘要
龙口水利枢纽各个勘测设计阶段都非常重视设计优化工作,尤其是工程开工建设以后,根据现场实际情况进行了大量卓有成效的设计优化工作,从而加快了工程进度,节约了工程投资。
Great attention has been paid to the design and optimization in the reconnaissance and design stage, especially after the construction was started. Optimization of design has been carried out in line with the actual conditions that accelerate the construction speed and save the cost.
出处
《中国水利》
2008年第8期19-21,24,共4页
China Water Resources
关键词
龙口水利枢纽
前期勘测
设计优化
Longkou Water Project
early-stage reconnaissance and design
design optimization