2008年年初,我国南方地区遭受了历史罕见的雨雪冰冻灾害,电网遭受重创,造成大面积停电,给工农业生产和人民生活造成严重影响。通过介绍贵州电网500kV鸭烽线路抢修过程,总结了线路抢修施工方法,包括锚线、拆除组立铁塔及架线施工方法,强调了线路抢修施工安全管理经验。针对输电线路部件损坏情况提出了具体的防范措施,并就线路设计、事故应急处理和除冰方面提出了建议。
In early 2008, southern China suffered a historical freezing rain and frost disaster, which severely damaged the power grid causing wide spread power failure and seriously affecting industrial and agricultural production and people's everyday lives. By introducing the course of Guizhou grid 500 kV Yafeng line emergency repair, methods for emergency line repair, including anchoring line, removing and erecting tower, and line stringing, are summarized, and emphasizes experiences of construction safety management. Specific preventive measures aiming to damaged parts are put forward, and suggestions on line design, emergency handling, and deicing, are proposed.