城市轨道交通项目与投资控制相关的几个优化问题 被引量:1

Several Optimized Problems Concerning the Construction Cost Management in Urban Rail Transit Project and Investment Control
下载PDF
导出
摘要 城市轨道交通项目建设期不同阶段与投资控制相关的技术优化重点不同,可行性研究阶段应当从规划技术的角度重点对投资控制进行总体优化,主要涉及项目的客流预测优化、线路总体设计优化、线路条件优化等,在满足功能的前提下总体控制建设规模和标准,降低建设费用。南京地铁一号线项目在这方面的成功实践,取得了良好的效果。 Based on different emphases of construction cost management of value engineering in different phases of urban rail transit project construction period and the optimized technology interrelated with investment control, investment control should be optimized in collectivity from layout technology angel in feasibil- ity research phase, mainly involving optimized visitors flux forecast, optimized circuitry design in collectivity, optimized circuitry conditions, etc. It is also involving the control of construction size and standard in collectivity to debase the cost of construction under the precondition of fulfilling the function. Nanjing Metro project carried out successfully in this aspect and has gained excellent effects.
作者 陈光
出处 《现代城市研究》 2008年第5期53-58,共6页 Modern Urban Research
关键词 投资控制 城市轨道交通 可行性研究 investment control urban rail transit feasibility research
  • 相关文献

参考文献8

二级参考文献15

共引文献79

同被引文献12

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部