期刊文献+

基于GSAA的停机位指派优化问题的研究 被引量:11

Airport Gate Assignment Problems Based on GSAA
下载PDF
导出
摘要 停机位的合理指派是机场地面作业中的一项核心任务,对减少枢纽机场航班中转时间起着重要作用,但是停机位指派问题是NP难问题,模型和算法都比较复杂.建立了以旅客满意度为优化目标的数学模型,并设计了一种贪婪模拟退火算法(GSAA),以求解枢纽机场的停机位指派问题.该算法首先根据贪婪算法FCFS准则使"丢失"的航班数最少得到模拟退火算法的初始解,然后运用经典模拟退火算法求解出最优指派结果.数值仿真证明了模型和算法的有效性. Airport gate assignment is a key task among the airport ground work which is important to reduce transfer time in hub airports. However, the gate assignment problem (GAP) is an NP-hard problem, and its models and algorithms ate complex. This paper proposes a model and a new greedy simulated annealing algorithm (GSAA) to resolve the GAP. The initial solution of the proposed algorithm is obtained through FCFS criterion of greedy method to minimize the "dropping" flights, and then the optimal solution is obtained through the traditional simulated annealing algorithm. Simulation result shows the validity of the model and the algorithm.
作者 鞠姝妹 许俐
出处 《交通运输系统工程与信息》 EI CSCD 2008年第1期138-143,共6页 Journal of Transportation Systems Engineering and Information Technology
基金 民航总局软科学基金项目(MHRD0622)
关键词 枢纽机场 停机位指派 旅客满意度 贪婪模拟退火算法 hub airport gate assignment problem the degree of passenger satisfaction greedy simulated annealing algorithm
  • 相关文献

参考文献2

二级参考文献28

  • 1文军,孙宏,徐杰,梁志杰.基于排序算法的机场停机位分配问题研究[J].系统工程,2004,22(7):102-106. 被引量:37
  • 2田晨,熊桂喜.基于遗传算法的机场机位分配策略[J].计算机工程,2005,31(3):186-188. 被引量:21
  • 3文军,李冰,王清蓉,杜文.机场停机位分配问题的图着色模型及其算法[J].系统工程理论方法应用,2005,14(2):136-140. 被引量:17
  • 4马辉,林晨.航班调度应急管理研究[J].中国民航学院学报,2005,23(5):11-14. 被引量:8
  • 5Gosling G D. Design of an expert system for aircraft gate assignment[J]. Transportation Research A,1990,24(1):59~69.
  • 6Su Y Y,Srihari K. A knowledge-based aircraft-gate assignment advisor[J]. Computers and Industrial Engineering, 1993, 25(2):123~126.
  • 7Babic O, Teodorovic D, Tosic V. Aircraft stand assignment to minimize walking[J]. Journal of Transportation Engineering,1984,110(1):55~66.
  • 8Bihr R A. A conceptual solution to the aircraft gate assignment problem using 0-1 linear programming[J]. Computers and industry Engineering, 1990,19(3):280~284.
  • 9Bolat A.Procedures for providing robust gate assign- ments for arriving aircrafts [J]. European Journal of Operational Research, 2000,120(1):63~80.
  • 10Arkin E M, Silverberg E B. Scheduling jobs with fixed start and end times[J]. Discrete Applied Mathematics, 1987,18:1~8.

共引文献40

同被引文献55

引证文献11

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部