摘要
九圩港大桥采用挂篮现浇悬臂施工,施工技术要求高,为使得该桥顺利合拢,符合设计要求,对该桥进行了施工控制。通过现场施工控制,该桥中跨合拢时的合拢段两端实测高程差与施工控制预计高程差在监控要求的范围内,说明该桥的施工控制是成功的。
Jiuweigang bridge was constructed with cantilever construction, this construction has higher technical re- quirements, so the bridge was supervised and controlled in the whole construction. The highness difference of theory and practice is accord with the code, the cantilever construction of the continuous box girder is succeeded in construction control. This refers to the construction of this sort bridges.
出处
《黑龙江交通科技》
2008年第4期75-75,77,共2页
Communications Science and Technology Heilongjiang
关键词
连续箱梁
现浇悬臂施工
施工控制
continuous box girder
cantilever construction
construction control