期刊文献+

金沙江梯级水库发电优化调度研究 被引量:1

Long-term optimal power scheduling of cascade hydropower plants in Jinshajiang River
下载PDF
导出
摘要 以金沙江干流梯级水库群为研究对象,建立了兼顾保证出力要求以发电量最大为目标的梯级长期优化调度模型,利用遗传算法求解,同时还考虑了虎跳峡龙头水库的补偿调节作用,结果显示,梯级优化联合调度的效果更好,虎跳峡水库的补偿作用较为明显. We established a long-term optimal power scheduling model for Jinshajiang cascade hydropower plants. The model took the power generation as optimal target in consideration of other power output requirements. Genetic algorithm was used to solve the problem. The compensative regulation of Hutiaoxia reservoir in Yunan Province, China, was taken into account. The research result shows the better effect of the optimal combined scheduling for cascaded hydropower plants, in which the Hutiaoxia reservior displays an obvious compensation function.
出处 《应用科技》 CAS 2008年第5期68-72,共5页 Applied Science and Technology
关键词 梯级水库群 遗传算法 补偿调节 金沙江 cascade hydropower plants long-term optimal scheduling genetic algorithm (GA) compensating operation Jinshajiang River
  • 相关文献

参考文献3

  • 1HUANG Wencheng, YUAN Lunchin, LEE Chiming. Linging genetic algorithms with stochastic dynamic programming to the long-term operation of a muhireservior systems[ J]. Water Resources Research ,2002,38(12) :41-49.
  • 2YANG Shenqin. Prospect of Jinsha River-a huge hydropower base in China [ J ]. Electricity,2004,1 : 21-25.
  • 3王少波,解建仓,孔珂.自适应遗传算法在水库优化调度中的应用[J].水利学报,2006,37(4):480-485. 被引量:54

二级参考文献8

共引文献53

同被引文献7

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部