摘要
从可靠性、安全性、实用性和经济性的角度,分析比较了华电国际邹县发电厂四期2×1000MW超超临界机组厂用电系统设计过程中的各种因素,确定了最终设计方案,针对该方案的特点和运行中出现的问题,总结了设计和运行中应注意的事项。
The various factors influencing the auxiliary power system were analyzed and compared from different aspects of reliability, safety, usability and economy, and the final design scheme was determined for 2 × 1000 MW ultra-superefitieal unit in Zouxian Power Plant phase Ⅳ. Some matters needed to pay attention in design and operation were summarized based on the design features and the operation problems.
出处
《华电技术》
CAS
2008年第5期55-59,共5页
HUADIAN TECHNOLOGY
关键词
超超临界机组
厂用电系统
设计特点
uhra-supercritical unit
auxiliary power system
design feature