摘要
介绍了进度控制的任务及其影响进度计划的因素,从计划、执行、检查、分析、调整各环节论述了进度控制的要点,介绍了进度计划调整的方法以及调整的原则,以做好施工进度的计划与衔接,从而保证工程建设进度目标的实现。
It introduces the period controlling task and its effective factors on construction planning,from planning,execution,checking,analysis and adjustment,it discusses the key points of period controlling.It also introduces the methods and adjusting principles,so as to do well in constructing planning,and ensure the realization of project period.
出处
《山西建筑》
2008年第16期213-214,共2页
Shanxi Architecture
关键词
进度控制
计划
管理
调整
period controlling,planning,management,adjustment