摘要
针对寿县正南淮堤砂堤砂基堤后翻砂鼓水和散浸等险情,采取堤身锥探灌浆、堤基截渗等加固措施,大大减轻了正南淮堤历年来的的度汛压力。
This paper examines the dangerous conditions of piping and seepage of the sandy dike and foundation of the Zhengan Huai dike at Shouxian County, and discusses the reinforcement method by cone drilling grouting of dike body and seepage cutoff of dike foundation. The method can be used to lighten the pressure of getting through the flood season for this dike.
出处
《安徽建筑工业学院学报(自然科学版)》
2008年第2期34-37,41,共5页
Journal of Anhui Institute of Architecture(Natural Science)
关键词
堤身
堤基
锥探灌浆
堤基截渗
Dike body
Dike foundation
Cone drilling
Seepage cutoff of dike foundation