摘要
在多次试验的基础上,阐述了上海锅炉厂生产的SG420/13.7-M415型锅炉与上海汽轮机厂生产的N215-135/535/535型汽轮机配套的125MW机组在60MW-125MW之间变负荷调峰的安全性和经济性,并对影响贵溪电厂4号机组供电煤耗的因素提出了改进建议。
Based upon Several tests with load between 50MW-125MW, the security and economy of peak-load regulation are discussed on 125MW unit in whieh SG420/137-m415 Boiler is produced by Shanghai Boiler works and H215-135/535/535 turbin is produced by Shanghai Turbin works. The influenee factors of coal rate of electric supply on №4 unit of Guixi power plant and improving advice are raised.
出处
《江西电力》
1997年第2期1-6,共6页
Jiangxi Electric Power
关键词
发电厂
发电机组
变负荷调峰
试验
variable load ,peak load-regulating, boiler circulation, coal rate of electric supply.