快速治水方案在立井施工过程中的应用和探讨 被引量:3

Application and Discussion of Quick Preventing Floods by Water Control in Vertical Shaft Construction Process
下载PDF
导出
摘要 快速治水方案,简便易行,使用较少的设备和人员,就可以把水量和治水费用控制为最低,同时可以有效的消除立井施工过程中水的影响,既能为井下工作人员创造出更好的施工环境,又能提高了井壁的表面质量,还能缩短井筒工程的工期。 The construction regulates waterways fast the plan, easy to do, and easily uses few equipment and the personnel, may regulates waterways the expense control for lower water volume; Simultaneously may in the effective elimination vertical shaft construction process the water influence, both can creates the better construction environment for the mine shaft staff, and could improve the wall of the well surface quality, and also can reduces the time limit for the well chamber project.
作者 郝先虎
机构地区 河南富昌公司
出处 《煤炭技术》 CAS 2008年第6期151-153,共3页 Coal Technology
关键词 治水 壁后注浆 导水管 截水槽 注浆压力 prevent floods by water control note thick liquid after wall pipe drawing water cut - off kitchen sink pressure of slip casting
  • 相关文献

同被引文献8

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部