摘要
从投标报价阶段、施工合同签订阶段、工程施工阶段及竣工结算阶段等方面探讨了建筑施工企业如何合理应用工程量清单计价,从而使施工企业尽快适应这种新的计价模式,使企业获得较高利润。
The paper makes a consideration from four aspects of tender offer stage, sign stage on construction contract, project construction stage and the finishing-work check stage and so on, and discusses the architectural construction enterprises on how to reasonably use the quantities list to account price, so as to adapt the construction enterprises to the new accounting-price mode as soon as possible, and create higher profits for the enterprises.
出处
《山西建筑》
2008年第17期267-268,共2页
Shanxi Architecture
关键词
工程量清单
合同
施工
投标报价
企业
the quantities list, contract, construction, tender offer, enterprises