摘要
采空区治理是一项十分复杂且隐蔽性很强的工程,必须认真落实检测项目,确保工程质量和使用安全。采用综合的治理方法和手段,可节省资金,从而达到良好的效果。
Goal treatment is very complex and strong concealment engineering, whose testing items must be implemented seriously to ensure engineering quality and service safety. Adopting integrated treatment measures and means can save fund, consequently achieving favorable effect.
出处
《交通标准化》
2008年第6期233-235,共3页
Communications Standardization