摘要 由于园区配电网规划受招商引资的力度、变电站站址、线路廊道或排管、环保等多种约束条件限制,规划决策者通常要面临一个由相互关联的各个部分构成的复杂系统,这种复杂系统的决策问题大都属于多因素决策问题,其解决的关键在于如何在一系列非劣解中确定最优解。通过在多元约束条件下数学优化计算,同时采用人工干预的方法,确定其配网规划最优方案,从而体现出其配网规划先进性、科学性、经济性,同时具备一定的超前性。 As distribution network planning of zone is limited by the intensity of investment, the substation site, the lines and pipes direction, the environmental and other sanctions, the plan makers often have to face an interrelated composition of the various parts of the complex system. The decision- making problems for this complex system belong to the multiple factor decision - making problems, The key to solve these problems is how to find the optimal solution in a series of non - inferior solution. After introducing the optimization method based on multiple constraints and artificial intervention, the optimal method for distribution network planning is determined. This method can make the distribution network planning advanced, scientific and economic.
作者 陈利 唐文左
出处 《四川电力技术》 2008年第3期38-41,共4页 Sichuan Electric Power Technology
关键词 多元约束条件 园区配电网规划 优化方法 multiple constraints distribution network paining of zone optimization method
  • 相关文献

参考文献8

  • 1《城市电力规划规范》[S].国家建设部颁发的建表(1999)149号.
  • 2《城市电力网规划设计导则》[S].能源部、建设部联合颁发的能源电(1993)228号文.
  • 3《城市配电网优化的指导意见》[S].中电联供电分会技术管理专委会,2003年3月.
  • 4《城市中低压配电网改造技术导则》[S].中华人民共和国电力工业部发布电力行业标准,DL/T599-1996.
  • 5陈章潮,唐德光.《城市电网规划与改造》[M].北京:中国电力出版社.
  • 6方向晖.中低压配电网规划与设计基础[M].北京:中国水利水电出版社,1998.
  • 7E.LakerviE.J.Holines著,范明天,张祖平,岳宋斌译.配电网络规划与设计[M].北京:中国电力出版社,2003.
  • 8G J Salis, A S Safigianni. Optimum long - term planning of a radial primary distribution network. International Journal of Electrical Power & Energy Systems, Vol.20, No. 1,1998, p.35 - 41,0142 - 0615.