由于园区配电网规划受招商引资的力度、变电站站址、线路廊道或排管、环保等多种约束条件限制,规划决策者通常要面临一个由相互关联的各个部分构成的复杂系统,这种复杂系统的决策问题大都属于多因素决策问题,其解决的关键在于如何在一系列非劣解中确定最优解。通过在多元约束条件下数学优化计算,同时采用人工干预的方法,确定其配网规划最优方案,从而体现出其配网规划先进性、科学性、经济性,同时具备一定的超前性。
As distribution network planning of zone is limited by the intensity of investment, the substation site, the lines and pipes direction, the environmental and other sanctions, the plan makers often have to face an interrelated composition of the various parts of the complex system. The decision- making problems for this complex system belong to the multiple factor decision - making problems, The key to solve these problems is how to find the optimal solution in a series of non - inferior solution. After introducing the optimization method based on multiple constraints and artificial intervention, the optimal method for distribution network planning is determined. This method can make the distribution network planning advanced, scientific and economic.
出处
《四川电力技术》
2008年第3期38-41,共4页
Sichuan Electric Power Technology
关键词
多元约束条件
园区配电网规划
优化方法
multiple constraints
distribution network paining of zone
optimization method