期刊文献+

MRP逆向运算在制造业企业中的实现方法 被引量:5

The Implementation of MRP Reverse Operation on Manufacturing
下载PDF
导出
摘要 通过对现有制造业企业的资源规划系统MRP的分析,提出了用MRP逆向运算完善系统的方法。阐述了企业中实现MRP逆向运算的前期准备为计算富裕生产能力、核算可用库存量和确定关键物料。讨论了MRP逆向运算在制造业企业的资源规划中与MRP相互配合应用这一实现方法。 Based on the analysis of MRP in the resource planning system about manufacturlng, it suggests a method to improve the system that uses MRP reverse operation. The initial preparations for MRP reverse operation includes the calculation of wealth production capacity, accounting available inventory and identification of key materials on manufacturing. It discusses the implementation of MRP reverse operation on manufacturing that the MRP reverse operation and MRP coordinate with each other.
作者 陈昀 张志胜
出处 《中国制造业信息化(学术版)》 2008年第6期22-25,29,共5页
关键词 MRP MRP逆向运算 关键物料 可用库存量 MRP MRP Reverse Operation Key Materiel Usable Stocks
  • 相关文献

参考文献4

  • 1Foo G,Kinney L. Integrated pull manufacturing- the integ- ration of MRP and JIT systems[A]. Larry Seifert. Proceedings of the First International Conference on systems Integration on systerns Integration '90[C]. New Jersey: IEEE Press, 1990:415 - 425.
  • 2周如意.基于可用库存量的MRP运算及其逆运算.计算机与网络,2006,(10):123-124.
  • 3王虹,张宇.MRP系统的算法研究与实现[J].电脑与信息技术,2006,14(2):23-25. 被引量:5
  • 4钱志昂,张忠能.逆算MRP中BOM结构的研究[J].计算机工程,2004,30(B12):448-449. 被引量:1

二级参考文献3

  • 1余锐林,吴顺祥.基于低层码的MRP算法研究与实现[J].计算机工程与应用,2005,41(6):206-208. 被引量:8
  • 2Boykin R F.Enterprise Resource Planning Software:a Solution to the Return Material Authorization Problem[].Computers in Industry.2001
  • 3Prahalad C K,Hamel G.The Core Competence of the Corporation[].Harvard Business.1990

共引文献6

同被引文献23

  • 1刘运材.MRPⅡ的内涵、发展及其在我国的应用[J].江苏商论,2005(3):29-30. 被引量:1
  • 2史云,陈劲杰.基于逆向物流的MRP研究[J].物流科技,2005,28(5):8-11. 被引量:6
  • 3龚维,冯爱兰.MRP在包含逆向物流供应链中的应用[J].中国储运,2006(2):109-110. 被引量:3
  • 4周如意.基于可用库存量的MRP运算及其逆向运算.科技信息学术版,2006,(10):353-354.
  • 5Stock JR. Reverse Logistics. Council of Logistics Management. Oak Brook, IL, 1992.
  • 6Fleischmann, M., HR Krikke, R. Dekker, and SDP Flapper, A Characterisation of Logistics Network for Product Recovery [J], Omega 2000, 28(6).
  • 7Thierry M C, Salomon M, Van Nunen J, Van Wessenbove L. Strategic issuses in product recovery management[J]. California Management Review, 1995,37(2).
  • 8V. Daniel R. Guide, Mark E. Kraus, Rajesh Srivastava. Scheduling policies for remanufacturing[J], International Journal Production Economics, 1997, 48(2).
  • 9周如意.基于可用库存量的MRP运算及其逆向运算.计算机工程与应用,2005,3510.
  • 10周如意.基于可用库存量的MRP运算及其逆运算.计算机与网络,2006,(10):123-124.

引证文献5

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部