期刊文献+

船舶改装新旧船体对接处的电缆联接工艺探讨

Probe to technique for cable's recondition at the point where the relevant electric facilities joints between the original hull-blocks and new ones
下载PDF
导出
摘要 文章阐述了船舶改装工程中,对新旧船体对接处的相关电气设备,特别是对电缆的割断及修复提出了要求和修理工艺,以确保改装后的船舶电气可靠性、安全性达到或超过原船舶的水平。 This article elaborates the relevant electric facilities in joint areas between the original hull-blocks and new ones during vessels conversion. Especially, it also proposes some requirements and repair procedures for cables cutting and reconditioning. All these can ensure the reliability and safety of marine electric facilities to reach or surpass the original level after vessel's conversion.
出处 《中国修船》 2008年第3期28-31,共4页 China Shiprepair
关键词 船舶改装 电缆联接 通舱密封 vessel's conversion electric cable connection tightness between compartments
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部