摘要
直孔水电站是继金河水电站之后由西藏电力有限公司承担法人职责,按基本建设程序实施项目管理的水电工程。结合工作实践,介绍了直孔水电站工程建设管理概况,总结了管理经验,分析了存在的问题,并对西藏水电建设实施项目管理的若干问题进行了有益的思考。
The responsibility of legal person of the Zhikong Hydropower Station is undertook by the Tibet Electric Power Limited Company, followed the Jinshuihe Hydropower Station, and its project management was carried out according to the capital construction procedures. In combination with the working practice, this paper introduces briefly the project construction and management of the Zhikong Hydropower Station, summarizes the management experience, analyzes the existed problems and gives some useful thoughts on several problems of project management implementation of hydropower construction in Tibet.
出处
《水力发电》
北大核心
2008年第5期57-60,99,共5页
Water Power
关键词
项目管理
水电建设
直孔水电站
project management
hydropower construction
Zhikong Hydropower Station