通过香港后海湾干线南段工程的桥梁短线法预制箱梁节段施工实践,介绍短线法生产预制节段的工艺流程和质量控制。
This paper introduces the technological flow and the quality control of the short line production method of pre -cast unit based on the experience in the Deep Bay Link (South) Project in Hong Kong.