摘要 巨型机组的应用对水电站计算机监控系统的实时性、可靠性、安全性提出了更高的要求。对此,文中介绍了采用多通道并行的通信模式,以及多台采集服务器对列冗余策略,大大提高了数据采集与控制的性能指标。相关技术成功应用于三峡右岸电站监控系统。 Along with the application of gigantic hydropower generator, higher requirements for the real-time property, reliability, safety of the computer monitoring and control system for hydropower stations have been put forward. The adoptions of the multithread parallel communication pattern and the multiple data acquisition servers redundancy scheme are introduced herein, by which the property indexes of the data acquisition and control have been highly enhanced and the relevant technique has been successfully applied to the computer monitoring and control system for the right bank hydropower station of the Three Gorges Project as well.
出处 《水利水电技术》 CSCD 北大核心 2008年第4期69-72,共4页 Water Resources and Hydropower Engineering
关键词 三峡工程 右岸电站 计算机监控系统 巨型发电机组 数据采集与控制 H9000 MODBUS Three Gorges Project righe bank hydropower station computer monitoring and control system gigantic generating units data acquisition and control H9000 Modbus
  • 相关文献

参考文献1

二级参考文献7

共引文献66

同被引文献24

引证文献4

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部