摘要
重点分析了琅琊山抽水蓄能电站地下厂房及水道系统在充、蓄水过程中各监测部位观测值变化情况及围岩稳定情况,及时为电站安全运行提供了监测资料。
The variation of the observation values from all the monitored locations and the stability of the surrounding rock of the underground powerhouse and water conduit during the water filling and storing process of Lanyashan Pumped Storage Hydropower Station are emphatically analyzed herein, which provides the relevant monitoring data for the safety operation of the station.
出处
《水利水电技术》
CSCD
北大核心
2008年第4期79-82,共4页
Water Resources and Hydropower Engineering
关键词
地下厂房
水道系统
充水
蓄水
观测分析
琅琊山抽水蓄能电站
underground powerhouse
water conduit system
water filling
water storing
observation analysis
Langyashan Pumped Storage Hydropower Station