期刊文献+

2007年三峡水库运行调度分析

Analysis on Operating and Scheduling of Three Gorges Reservoir in 2007
下载PDF
导出
摘要 2007年,是三峡工程初期运行期的第一年,也是工程综合效益全面发挥的第一年。枯期,长江中下游遭遇多年未遇的枯水位,为保障通航安全,利用三峡水库对航运实施流量补偿调度,满足了枯季通航水位要求;汛期,为缓解长江中下游防洪压力,根据长江防总防洪调度指令,三峡开发总公司对4次较大洪水实施了防洪调度,为长江中下游的防洪安全做出了重要贡献。 In 2007, the first year of the initial operation stage of the Three Gorges Project and the first year when the project takes into effect, there in the middle and lower reaches of Yangtze River come up against singularly low water in the dry season and the demand of ship was satisfied by a special method which we named flow compensation operation. In the flood season, in order to reduce the pressure of lower reaches, China Three Gorges Project Corporation actualized the flood control operation to four greater floods based on the assignment of the Flood Control Headquarters of Yangtze River, which is an important contribution to the safety of the lower reaches of Yangtze River.
出处 《长江工程职业技术学院学报》 CAS 2008年第2期19-20,23,共3页 Journal of Changjiang Institute of Technology
关键词 三峡水库 蓄水 防洪调度 水情预报 Three Gorges reservoir impoundment flood control operation hydrologic forecasting
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部