叙述了平班水电站护坡工程混凝土施工的措施,特别对滑模施工提出了具体实施办法,可供类似工程借鉴。
The sliding form operation technology in slope project construction in Pingban Hydropower Station was introduced. Some methods were provided in detail, which will be a lesson to the similar projects.