期刊文献+

尤溪梯级整体开发财务评价初探

Tentative Approach to Financial Assessment of Overall Cascade Development of Youxi River
下载PDF
导出
摘要 尤溪为福建闽江右岸支流,规划为五级开发,街面水电站装机30万kW,为龙头水库电站,建成后对梯级(含水口水电站)和电网具有流量和电力双重补偿作用。为促进龙头水库早日开发,提出尤溪流域采用整体开发设想和研究,本文对多个项目一起开发的财务评价作了探讨。 The Youxi River,right bank tributary of Minjiang River in Fujian Province,is planned for harness of five cascades.The Jiemian Hydroelectric Plant with installed capacity 300 MW is the most upper reservoir station,after whose founding there is a dual compensation purpose for both discharge and electric power of cascades and network.In order to promote earlier founding the most upper reservoir,the overall Youxi River harness idea is presented.The financial assessment of multiproject harness in all is approached in the paper.
出处 《水电站设计》 1997年第4期38-42,共5页 Design of Hydroelectric Power Station
关键词 财务分析 梯级开发 开发方案 尤溪流域 Youxi cascade,scherme,financial analysis,cascade development.
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部