沈阳地铁车站降压变电所设置方案研究 被引量:2

Research on Step-down Substation Setting Plan for Shenyang Subway
下载PDF
导出
摘要 降压变电所的位置和设置方式对地铁车站的土建规模和供电系统的投资有很大影响。本文结合沈阳地铁一号线一期工程典型车站的土建结构和动力照明用电负荷的分布情况,通过经济技术分析、比较,深入研究地铁车站降压变电所的设置方案,在保证功能的前提下,达到合理利用资源,节约土建和供电系统投资的目的。 The position and location of service substation have great influence to the architecture dimensions and the power supply system's investment of underground station. According to the architecture structure and the power and lighting loads distributing of Shenyang section 1 line 1 typical underground station, this paper proposes a project of service substation location by analysis of investment and technology. Based on function, the project can make good use of resource and economize the investment of the architecture and the power supply system.
作者 白云鹏
出处 《电气化铁道》 2008年第3期41-44,共4页 Electric Railway
关键词 沈阳地铁 负荷分析 降压变电所 方案研究 Shenyang underground loads analysis service substation project study
  • 相关文献

参考文献1

  • 1[6]胡景生.变压器效能与节电技术[M].北京:机械工业出版社,2007.

同被引文献4

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部