摘要
广西昭平船闸的设计表明,采用墙顶带连杆的框架整体式结构,能够有效地改善闸室工作条件,减小结构尺寸,便于枢纽紧凑布置,有利于降低工程造价。
The designing of Guangxi Zhaoping ship lock indicates that using the framed integral structure may effectively improve lock room's working condition, decrease structure size, make the pivot convenient to be laid compactly and save the project's cost.
出处
《广西水利水电》
1997年第4期19-22,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
船闸
框架式闸室
结构设计
闸室
high water head ship lock, air face, linkage, frame