3Lockheed Martin.Space based infrared system-high:[EB/OL].[2004-08-10].http://www.lockheedmartin.com/wms/findPage.do?dsp=fec&ci=11497&rsbci=0&fti=126&ti=0&sc=400.
5Center for Defense Information.Budget overrun for SBIRS-high confirmed[EB/OL].[2004-07-09].http://www.cdi.org/program/issue/document.cfm?DocumentID=2310&IssueID=140&StartRow=1&ListRows=10&appendURL=&Orderby=DateLastUpdated&ProgramID=68&issueID=140#13.
6SMITH M.Military space programs:issues concerning DoD's SBIRS and STSS programs[EB/OL].[2003-11-03].http://www.fas.org/spp/starwars/crs/RS21148.pdf.
7Federal Business Opportunities Presolicitation Notice.Orbital deep space imager (ODSI) concept study RFP release[EB/OL].[2004-10-24].http://www2.eps.gov/spg/USAF/AFSC/SMCSMSC/FA8819%2D05%2DR%2D0001/SynopsisP.html.
9SANCHEZ N, CASAL E O, MEREDES R L, et al. Space based optical Images within a space surveillance system [C]. The 59th International Astronautical Congress, Scotland, 2008.