摘要
介绍忠县长江公路大桥11号墩主梁牵索挂篮采用的整体吊装施工方案。
This paper introduces the construction scheme adopted for the integral lifting and installation of guyed form traveler for the main girder atop pier No. 11 of Zhongxian Changjiang River Highway Bridge.
出处
《世界桥梁》
北大核心
2008年第A01期38-40,共3页
World Bridges
关键词
斜拉桥
牵索挂篮
整体吊装
桥梁施工
cable-stayed bridge
guyed form traveler
integral lifting and installation
bridge construction