摘要
本文针对陕西省黄陵一号煤矿三盘区的地质采矿条件和地表南河寨村建筑物的现状,在理论计算、地表移动和变形预计分析的基础上,对村庄建筑物下多工作面协调开采进行了分析研究,给出了多工作面协调开采方案及其参数,以及地表建筑物进行加固和保护的措施。论证了黄陵一号煤矿三盘区地表南河寨村压煤用多工作面协调开采在技术上的可行性。
In the paper, in the light of detailed geological mining condition in Huangling Coalmine in Shaanxi Province and the status-quo of surface village buildings, analysis and research are made on the coal mining technology in strips under village buildings based on the analysis of theoretical computation, surface movement and deformation estimation, and then the scheme and related parameters of the strip mining are given. It includes that stripe mining under village is viable in Nanhezai village.
关键词
建筑物
黄陵一号煤矿
协调开采
地表变形预计与分析
工作面停采线
building
No 1 Huangling Coal Mine
coordinated mining
prediction and analysis of surface deformation
stopping line of working face