白山梯级水电厂实施集中监控的探讨 被引量:5

Discussion on Realization of Centralized Monitoring of Baishan Cascade Hydropower Plant
下载PDF
导出
摘要 为满足现代化管理和机组经济运行的要求,白山水电厂设置了梯调中心对现场设备实行远方集中监控。通过对全厂主、辅设备基础自动化元件的改造和计算机监控系统的投运,实现了厂站与上级调度"四遥"控制,提高了设备运行的稳定性和可靠性。对远方集中监控运行管理模式以及实施过程中暴露的问题进行了分析,总结了相应的处理和防范措施。 To meet the requirement of modern management and economical operation of units, a cascaded dispatching center is built to realize remote central monitoring of local equipment of the Baishan Hydropower Plant. Through reformation of the automatic components of the equipment in the plant, remote measuring, remote communicating, remote controlling and remote adjusting between the plant and dispatching center are realized, and thus the stability and reliability of the equipment are improved. The management mode of remote centralized monitoring and correlative problems in the implementation are elaborated, and relevant measures are proposed.
作者 吴玮
机构地区 白山发电厂
出处 《水电自动化与大坝监测》 2008年第3期7-8,33,共3页 HYDROPOWER AUTOMATION AND DAM MONITORING
关键词 梯级水电厂 集中监控 计算机监控系统 自动化元件 cascade hydropower plant centralized monitoring computer monitoring and control system automatic component
  • 相关文献

参考文献3

  • 1方辉钦,施冲,朱辰,庞敏,彭永,吴正义.水电厂无人值班与监控系统改造[J].水电自动化与大坝监测,2003,27(1):1-5. 被引量:14
  • 2中国电力百科全书:水力发电卷.2版.北京:中国电力出版社,2001.
  • 3杨德晔,王冰.中国水力水电发电工程:机电卷.北京:中国电力出版社,2000.

二级参考文献2