摘要
简要描述了大亚湾核电站储运发电机备用转子的可选技术方案,对终选技术方案的强度、安全性、可操作性和经济性进行了阐述,并重点对终选技术方案进行了分步图解说明,通过对终选技术方案的详细描述,总结出对长轴型重件运输、存放技术准备的内容,文章终选的技术方案安全可靠、费用低,可广为借鉴和参考。
The paper briefs the optional technical scheme for transportation and storage of spare rotor of generator in Daya Bay Nuclear Power plant, expounds the strength verification, safety, maneuverability and economics of the final technical scheme, and especially illustrates the steps of the final technical scheme. The paper, through the detail description of final technical scheme, summarizes the technical preparation contents of transportation and storage of long-shaft type heavy equipment.The final technical scheme in this paper is safe,reliable and economical,may be widely adopted and used for reference.
出处
《电力设备》
2008年第6期69-72,共4页
Electrical Equipment
关键词
长轴型
大型设备
发电机转子
存放
运输
技术方案
long-shaft type
heavy equipment
generator rotor
storage
transportation
technical scheme