摘要
根据工程实例,介绍了高达70 m陡壁危岩加固施工技术,详细地介绍了预应力锚索施工技术在陡壁危岩加固中的关键工序、施工方法、质量控制方法,对类似工程有一定的指导作用。
According to the engineering example, the 70 m steep wall dangerous rock reinforcing construction technology was introduced. The key process, construction method and quality control method of steep wall dangerous rock reinforcement with the prestressed anchor wire construction technology, which had the guiding effect to the similar engineering.
出处
《山西建筑》
2008年第18期130-131,共2页
Shanxi Architecture
关键词
高空陡壁
危岩
施工技术
锚杆
预应力锚索
altitude steep wall, dangerous rock, construction technology, anchor arm, prestressed anchor wire