期刊文献+

TOD交通走廊形成机理分析及经验借鉴——以美国阿灵顿县R-B走廊为例 被引量:8

Analysis on the Forming Mechanism of TOD Traffic Corridor and Experience——Taking the R-B Corridor of Arlington County of USA as a Case
下载PDF
导出
摘要 TOD(Transit-Oriented Development,公共交通为导向的城市土地开发)交通走廊是以大运量的客运走廊为载体,通过选择若干站点进行TOD模式的开发,突破传统的单个节点开发形式,充分发挥规模效应,形成整合优势。本文以华盛顿特区西南部的阿灵顿县(Arlington County)的Rosslyn-Ballston轴状走廊(下文简称R-B走廊)为例,从宏观、中观和微观三个层次分析其形成机理,总结出TOD交通走廊建设的成功经验。 TOD traffic corridor can support large passenger transport volume. Through choosing a number of sites for the exploration of TOD, we can break through a traditional form of noding, and fully display the effect of large scale, so, the integrated advantage will appear. Taking the Rosslyn-Ballston axle-shaped corridor of Arlington County (that is called R-B corridor for short in the following text) as a case, which locates in the south-west of Washington D.C., we analyzed the formation mechanisms of the corridor from different levels, and summarized the positive experience from the TOD traffic corridor constructing.
出处 《交通运输工程与信息学报》 2008年第2期85-90,101,共7页 Journal of Transportation Engineering and Information
关键词 R-B走廊 交通为导向的土地开发 客运走廊 R-B corridor, TOD, passenger transport corridor
  • 相关文献

二级参考文献30

  • 1R. Cervero, Induced Travel Demand: Research Design, Empirical Evidence, and Policy Directions. Journal of Planning Literature, Vol. 17, No. 1,2002, pp. 3-20.
  • 2.[EB/OL].See: http://www.usc.cuhk.edu.hk/wk_wzdetails.asp?id=2906.,.
  • 3.[EB/OL].See: http://www.hbjt.gov.cn/page/zc2/LWJCP/LWJCP 1763.htm.,.
  • 4.[EB/OL].See: http://www.fudan.edu.cn/fudannews/news_content.php?channel=3&id-4742.,.
  • 5Z. Ganshi, "Urban Transport Problems in Chinese Cities: Causes, Trends and Options", China's Urban Transport Development Strategy, Washington, D.C.,World Bank Discussion Paper No. 352, 1999, p. 37.
  • 6T. Zhang, "Challenges Facing Chinese Planners in Transitional China", Journal of Planning Education and Research, Vol. 22, 2002, pp. 64-76.
  • 7R. Cervero, The Transit Metropolis, Washington, D.C., Island Press, 1998.
  • 8F. FitzRoy and I. Smith, Priority over Pricing: Lessons from Zurich on the Redundancy of Road Pricing, Journal of Transport Economics and Policy, Vol,27, No. 2, 1993, pp. 209-214.
  • 9Consejo Nacional de Politica Economica y Social, "Sistema de Servicio Publico Urbano de Transporte Masivo de Pasajeros de Bogota", Departamento Nacional de Planeaci6n, Documento No. 3093, 2000.
  • 10E. Sandavol and D. Hildalgo, "TramsMilenio: A High Capacity - Low Cost Bus Rapid Transit System Developed for Bogota, Colombia", 2002,Transmilenio, S.A., Bogota, Colombia.

共引文献69

同被引文献63

引证文献8

二级引证文献60

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部