基于EVM的进度成本控制算法研究 被引量:1

Study on control algorithm of schedule cost based on EVM
下载PDF
导出
摘要 为满足信息系统工程建设监理需要,文章引入了目前项目管理中先进的EVM技术来进行进度成本的跟踪控制,给出了具备优化功能进度控制算法的设计及相关流程图。 To meet the needs of the information system engineering construction surveillance, this paper introduced the advanced EVM technology into the schedule and cost control, gave the design and the related flow chart of schedule control algorithm which has the optimized function.
出处 《企业技术开发》 2008年第6期124-126,共3页 Technological Development of Enterprise
关键词 EVM 信息系统工程建设监理 进度控制 EVM(Earned Value Management) information system engineering construction surveillance schedule control
  • 相关文献

同被引文献7

  • 1Kim EH, Wells W Jr, Duffy MR. A model for effective implementation of Earned Value Management methodology. International Journal of Project Management, 2003, (21): 375 -382.
  • 2李可峰.挣值综合管理方法研究.湖南大学,2009.
  • 3Li P, Hu YB.Optimization of PERT Network.
  • 4Compression of Time. Journal of Southwest Jiaotong University, 2005,13(2).
  • 5王东强.作业车间制造系统生产进度提取方法及应用研究.重庆大学.2010.
  • 6袁鑫.EVM在工程建设实施阶段的应用研究.华北电力大学.2005.
  • 7朱娟,仲梁维.基于PLM的车间工时管理系统[J].计算机系统应用,2011,20(4):40-44. 被引量:6

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部