摘要
对抽水蓄能电站尾水调压室的设计规范进行了探讨,结合可逆机组的实际运行情况与工程算例,研究了关闭规律、运行工况、输水系统布置方案以及压力脉动对尾水管内最小负压的影响,得到的相关结论可供抽水蓄能电站输水系统设计参考。
The specifications for design of tailrace surge chamber at pumped storage plant are discussed in this paper, and the influence of wicket gate closing law, operactional regime layout of water conveyance system and pulsating pressure on the minimum negative pressure in draft tube is studied in connection with the actual operational and engineering calculating example of pumped storage plant. The beneficial conclusions which can be referenced for the design of other pumped storage plant water conveyance system are obtained.
出处
《水电能源科学》
2008年第3期83-87,132,共6页
Water Resources and Power
基金
水资源与水电工程国家重点实验室开放基金资助项目(2006B030)
水利部科技创新基金资助项目(SCX2003-08)
关键词
抽水蓄能电站
尾水调压室
行业规范
水泵水轮机
输水系统
水锤
pumped storage plants
tailrace surge tank
specifications for design
reversible pump-turbine
water conveyance system
water hammer