摘要
本文通过对乐昌峡水电站进行过渡过程计算与分析,提出了一系列优化方案,总结了常规电站尾水系统过渡过程的计算经验,为同类工程提供借鉴。
This paper put forward a series of optimization scheme and sums up the calculation experience of tail water system transition process of the conventional power station, and provides reference for similar projects, based on the computation and analysis of Lechang Gorge Hydropower Station.
出处
《吉林水利》
2008年第6期23-25,共3页
Jilin Water Resources
关键词
过渡过程
常规电站
尾水系统
transition proeess
conventional power station
tail water system