摘要
应用动态大系统模型解耦方法和分割求解法,将大型水电站仿真培训系统的教学模型分解成若干个独立运算的子系统,大大减少了每一时步的计算时间,并将该方法应用到一水电站仿真培训系统。
Model decoupling method and partitioned solution method are used in decomposing a simulation system for large scale hydropower station into sevral subsystems which can be calculated independently in every the step. The results obtained in the simulation for a large scale hydropower station show considerable reduction in the simulation time.
基金
电力部重点实验室建设项目