摘要
介绍大峡水电站接地系统施工过程充分利用自然接地体的经验,并对接地系统进行计算分析,实验验证,满足了接地标准及规范验收要求。
The natural mode was used fully in construction of grounding system for Daxia Hydropower Station. The experience, computation and analysis of the system, verification by testing are expounded in this paper, which satisfied the grounding standard and the requirement of construction norm.
出处
《陕西水力发电》
1997年第4期25-31,共7页
Journal of Shaanxi Water Power
关键词
接地装置
施工
电阻
测试
水电站
Grounding device, Construction, Resistance computation and analysis