三峡工程大坝及电站厂房设计中的主要技术问题 被引量:1

Major technical problems on design of TGP dam and powerhouses
下载PDF
导出
摘要 泄洪与消能设计、厂1~5号坝段深层抗滑稳定研究、电站压力引水管道和混凝土配合比设计等是三峡大坝及电站厂房设计中的主要技术问题。这些技术问题历数年、数十年之研究,几经众多科研、设计单位刻苦攻关,于今已基本解决确定下来。在大江截流、三峡二期工程即将开始之际,对这些主要技术问题进行概要论述,冀望在今后施工设计中能结合工程实际更进一步完善优化,以创一流设计水平。 Major technical problems on design of TGP dam and powerhouses include the design of flood releasing and energy dissipation, the study on stability against deep layer sliding at No. 1~5 powerplant dam sections, the design of powerplant penstocks and concrete mix proportion, etc. Through hard efforts made by many scientific research and design units for several years, or several decades, these technical problems have been basically solved. On the occasion that the main river closure and second stage construction will soon be started, these problems are briefly expounded in order that their resolutions in construction detail design would be perfected and optimized in accordance with engineering practices, so as to create the first class design level.
作者 郑守仁 刘宁
机构地区 长江水利委员会
出处 《人民长江》 北大核心 1997年第10期3-6,共4页 Yangtze River
关键词 水利枢纽工程 三峡工程 大坝 厂房 设计 Sluice opening Dissipator Intake of hydropower station Intake conduit Concrete mix proportion Sanxia Multipurpose Project
  • 相关文献

同被引文献2

引证文献1

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部