长江委三峡一期工程建设监理工作

Construction supervision for TGP first stage works
下载PDF
导出
摘要 长江委工程建设监理中心承担三峡右岸一期工程及左岸部分工程的监理任务。监理中心受业主委托实行“三控制、二管理、一协调”即全面全过程地对施工进度、工程质量、工程投资实行控制并进行合同管理,信息管理和协调各方关系,在各方支持帮助下,受监工程进展比较顺利。4年来,主要工程项目大多能按进度计划完成或接近完成其工程量与形象进度,质量能满足设计要求,投资控制在合同报价之内。监理部在三峡工程的监理宗旨、内容、方式、方法以及与此相应的一系列规章制度,工作程序上提出了一些具有探索与开拓性的见解与作法。 Engineering Supervision Center of Changjiang Water Resources Commission has undertaken supervision tasks of Stage I construction on right bank and a part of works on left bank of TGP. Entrusted by the owner, the Supervision Center has implemented controls over construction progress, construction quality and project investment, supervision on contract implementation and information management and coordination among various related aspects. Under the common effort of various aspects, the supervised items have proceeded smoothly. For the past four years, the construction quantity and configuration progress of the most items have been fulfilled on schedule, with construction quality meeting design requirements and investment controlled under contract price. The supervision department has put forward some new ideas and approaches about aims, contents, ways and means, related rules and regulations, and work procedures of the TGP supervision tasks.
作者 付正义
出处 《人民长江》 北大核心 1997年第12期4-6,共3页 Yangtze River
关键词 质量控制 施工 监理 三峡工程 Engineering management Quality control Construction schedule Sanxia Multipurpose Project
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部